Hotel
Harbor Retreat
Trincomalee, Sri Lanka2024
A boutique hotel pool with reflecting pools framing the harbour view.
24m
Pool Length
17 weeks
Build Duration
310,000L
Water Volume
2024
Completed
This boutique hospitality project pairs a compact horizon pool with two still reflecting pools that frame the walkway from lobby to beach, extending the sense of water throughout the arrival sequence.
Commercial-grade filtration was concealed beneath a raised timber deck to keep the plant room fully out of sight.
Highlights
- Reflecting pool arrival sequence
- Concealed plant room
- Commercial filtration
- Timber deck integration
Project timeline
How this project came together.
01
Design
3 weeksSite survey, concept design, and engineering documentation.
02
Excavation & Structure
4 weeksExcavation, steel reinforcement, and the structural shell.
03
Finishing & Systems
5 weeksWaterproofing, tiling, coping, and plant room installation.
04
Handover
1 weekCommissioning, water balancing, and client orientation.
Related services
Services behind this project.
Inspired by this project?