Hotel
Lago Vista Resort
Bentota, Sri Lanka2024
A horizon-edge resort pool anchoring a beachfront hospitality redevelopment.
42m
Pool Length
22 weeks
Build Duration
980,000L
Water Volume
2024
Completed
Lago Vista's signature pool was designed as the visual and social centrepiece of a full resort redevelopment, with a horizon edge that appears to merge directly with the Indian Ocean.
The brief called for continuous commercial operation at high bather load, delivered through a zoned design separating the family pool, swim-up bar, and adults-only deck.
Highlights
- Horizon edge
- Swim-up bar
- Zoned family & adult decks
- Commercial filtration
Project timeline
How this project came together.
01
Design
3 weeksSite survey, concept design, and engineering documentation.
02
Excavation & Structure
4 weeksExcavation, steel reinforcement, and the structural shell.
03
Finishing & Systems
5 weeksWaterproofing, tiling, coping, and plant room installation.
04
Handover
1 weekCommissioning, water balancing, and client orientation.
Related services
Services behind this project.
Inspired by this project?