Residential
Coral House
Mirissa, Sri Lanka2023
A beachfront family pool built to withstand salt air and monsoon swell.
15m
Pool Length
14 weeks
Build Duration
138,000L
Water Volume
2023
Completed
Positioned metres from the shoreline, this pool required corrosion-resistant equipment specification and a structural design rated for high water tables and monsoon rainfall.
A shallow sun ledge and integrated water feature give the family multiple ways to use the pool across a single design.
Highlights
- High water-table engineering
- Corrosion-resistant equipment
- Sun ledge
- Integrated water feature
Project timeline
How this project came together.
01
Design
3 weeksSite survey, concept design, and engineering documentation.
02
Excavation & Structure
4 weeksExcavation, steel reinforcement, and the structural shell.
03
Finishing & Systems
5 weeksWaterproofing, tiling, coping, and plant room installation.
04
Handover
1 weekCommissioning, water balancing, and client orientation.
Related services
Services behind this project.
Inspired by this project?