Skip to content
Continental Pool

Luxury Villa

Skyline Penthouse

Colombo 3, Sri Lanka2025

A penthouse plunge pool and jacuzzi suite with panoramic city views.

8m
Pool Length
9 weeks
Build Duration
48,000L
Water Volume
2025
Completed

A compact penthouse footprint called for a design that did more with less — a sculptural plunge pool, integrated jacuzzi, and a sauna tucked beneath the terrace pergola.

Every element was pre-fabricated off-site where possible to minimise crane time and disruption to the building's other residents.

Highlights

  • Penthouse plunge pool
  • Integrated jacuzzi
  • Pergola-shaded sauna
  • Off-site pre-fabrication

Project timeline

How this project came together.

01

Design

3 weeks

Site survey, concept design, and engineering documentation.

02

Excavation & Structure

4 weeks

Excavation, steel reinforcement, and the structural shell.

03

Finishing & Systems

5 weeks

Waterproofing, tiling, coping, and plant room installation.

04

Handover

1 week

Commissioning, water balancing, and client orientation.

Related services

Services behind this project.

Inspired by this project?

Let's design something just as considered for you.

Request a Quote