Skip to content
Continental Pool

Renovation

Tropical Spa House

Kalpitiya, Sri Lanka2024

A full renovation transforming a decade-old pool into a wellness-led retreat.

16m
Pool Length
10 weeks
Renovation Duration
160,000L
Water Volume
2024
Completed

This ten-year-old pool had failing waterproofing, dated coping, and undersized filtration. We stripped the shell back to structure, re-waterproofed, and rebuilt with a mineral pebble finish and a new commercial-grade filtration system.

A sauna and outdoor shower were added to the deck, turning a tired backyard pool into the property's wellness centrepiece.

Highlights

  • Full re-waterproofing
  • Mineral pebble refinish
  • Filtration upgrade
  • New sauna addition

Before & after

See the transformation.

Before — faded surface, dated copingAfter — mineral pebble finish, new deck

Project timeline

How this project came together.

01

Assessment

1 week

Structural and waterproofing survey of the existing shell.

02

Strip-out

2 weeks

Removal of failing tiling, coping, and legacy equipment.

03

Rebuild

6 weeks

Re-waterproofing, new finish, and filtration installation.

04

Handover

1 week

Water balancing and client walkthrough.

Related services

Services behind this project.

Inspired by this project?

Let's design something just as considered for you.

Request a Quote